Main tasks

Task no.2 ‘Search and selection of a test site’ is at the heart of the project as its success will determine whether or not the operational phase will proceed, after 18 months. 

In order to support the search for a suitable site, the project relies on two groups of workpackages (WP) divided into technical (no.s 3-6 on the left) and non-technical (Law and Sociology, no.s 7 and 8 on the right). These two groups rely themselves on the results of WP2, as represented by the double arrows in the figure.

The results of these two WP groups and those of WP2 will feed into WP9 to prepare for the following operational phase and into WP10 ‘Dissemination/Publications’.